EN 10204 is the European standard that defines the types of inspection document supplied with metallic products. Clause 1.1 puts it plainly: it specifies the different types of inspection documents supplied to the purchaser, in accordance with the requirements of the order, for the delivery of all metallic products — plates, sheets, bars, forgings, castings, whatever their method of production. Clause 1.3 adds the part buyers most often forget: the standard is used in conjunction with the product specifications that set the technical delivery conditions.
So EN 10204 does not set chemistry, mechanical properties or test requirements. Those come from EN 10216-5, ASTM A312, ASTM B622 and the rest. What EN 10204 fixes is narrower, and more often misunderstood: how much testing evidence the document carries, and who is entitled to validate it.
The current edition is EN 10204:2004, approved by CEN on 8 August 2004 and superseding EN 10204:1991. It defines four document types — 2.1, 2.2, 3.1 and 3.2. This guide works through the scope, the definitions of specific and non-specific inspection, what each document type actually guarantees, what a 3.1 certificate must contain, how the 1991 types map onto the current ones, how the standard relates to ASTM mill certificates and to the Pressure Equipment Directive, and the wording to put in a purchase order so that the certificate you receive is the one you asked for.
Updated: 4 November 2026. Clause references on this page were checked against the published English text of EN 10204:2004 (reference EN 10204:2004: E) on that date. This is an independent technical overview prepared for buyers; acceptance decisions remain with the contract, the product specification and the governing design code.
What EN 10204 covers — and what it does not
Three consequences follow from the scope in Clause 1, and between them they explain most of the confusion in the market.
- EN 10204 does not define the tests. Clause 4.1 states that the test unit and the tests to be carried out are defined by the product specification, the official regulation and corresponding rules, and/or the order. Hydrostatic testing, eddy-current inspection, impact testing, corrosion testing and PMI are requirements of the product specification or of your order — the standard only governs how the results are reported and validated.
- The type number is not a ranking of the mill. A 3.1 certificate from a disciplined producer and one from a careless producer look the same on the page. Reading the certificate is a separate exercise from trusting the type number.
- The type must be stated in the order. EN 10204 applies when a product specification or the purchaser’s order requires an inspection document. If the order is silent, a supplier can legitimately deliver a 2.1 declaration carrying no test results.
Clause 1, Note 1 points to EN 10168 for the list of information that may be included in an inspection document for steel products; it is a data-field standard used alongside EN 10204, not an alternative to it. ISO 10474:2013 covers the same ground internationally with the same four document types, so a 3.1 requirement translates directly between the two systems — but cite the one your contract names.
The four EN 10204:2004 document types
Annex A summarises the four types in Table A.1. Each step up the table adds test evidence, independence of validation, or both. The German and French designations are included because they appear on certificates in circulation and in translated project specifications.
| Type | Designation | Document content | Validated by | Basis |
|---|---|---|---|---|
| 2.1 | Declaration of compliance with the order Werksbescheinigung Attestation de conformité | Statement that the products comply with the order. No test results. | The manufacturer | Non-specific (Clause 3.1) |
| 2.2 | Test report Werkszeugnis Relevé de contrôle | Statement of compliance, plus the results of non-specific inspection. | The manufacturer | Non-specific (Clause 3.2) |
| 3.1 | Inspection certificate 3.1 Abnahmeprüfzeugnis 3.1 Certificat de réception 3.1 | Statement of compliance, plus the results of specific inspection. | The manufacturer’s authorised inspection representative, independent of the manufacturing department | Specific (Clause 4.1) |
| 3.2 | Inspection certificate 3.2 Abnahmeprüfzeugnis 3.2 Certificat de réception 3.2 | Statement of compliance, plus the results of specific inspection, prepared by both parties. | The manufacturer’s authorised inspection representative and either the purchaser’s authorised inspection representative or the inspector designated by the official regulations | Specific (Clause 4.2) |
Two things the table does not say. It does not say that 3.1 requires 100% inspection of every length: specific inspection is carried out on the products to be supplied or on test units of which those products are part, and the product specification decides whether that unit is a heat, a heat-treatment batch or a lot. And it does not say that 2.1 and 2.2 are bad documents — they are the correct documents for applications that need no test evidence. Paying for 3.1 on a commodity order buys paperwork, not quality.
Specific inspection versus non-specific inspection
Clause 2 carries the definitions, and they matter more than the type numbers, because they decide whether the results on the certificate belong to your material.
Specific inspection (Clause 2.2) is carried out before delivery, according to the product specification, on the products to be supplied or on test units of which those products are part, to verify that they comply with the requirements of the order. The results therefore describe your heat, heat-treatment batch or test lot, and can be matched to the markings on the tubes.
Non-specific inspection (Clause 2.1) is carried out by the manufacturer in accordance with its own procedures, to assess whether products defined by the same product specification and made by the same manufacturing process comply with the order. The clause is explicit: the products inspected are not necessarily the products actually supplied. A 2.2 test report is genuine and useful — it shows the capability of that product line — but it cannot prove that a particular length in your shipment met a particular limit.
If your acceptance depends on a number — a minimum yield strength, a maximum carbon content, a PREN value, an impact energy — that number has to come from specific inspection, and therefore from a 3.1 or 3.2 document.
Who validates the certificate
Clause 5 requires the inspection document to be validated by the responsible person or persons, with name and position, and allows retention and transmission in electronic or paper form. Clause 4 then defines who that person is for each type.
For 2.1 and 2.2 the document is issued and validated by the manufacturer. For 3.1 the signatory is the manufacturer’s authorised inspection representative, independent of the manufacturing department — a production manager cannot sign off material their own department made. For 3.2, Clause 4.2 requires the certificate to be prepared by that representative and either the purchaser’s authorised inspection representative or the inspector designated by the official regulations.
That is the whole difference between 3.1 and 3.2, and it is worth stating plainly because the two are constantly confused: 3.1 is an internal independence, 3.2 is an external signature. No amount of asking a mill for “3.1 with third-party inspection” converts one into the other. If a project needs witnessed testing, it needs 3.2, arranged before the tests are performed.
What a 3.1 inspection certificate must contain
The standard defines the document by what it declares and how it is validated; it does not prescribe a form. The checklist below is what a buyer should verify line by line. Layouts differ between mills and between languages, so read by meaning rather than by position on the page.
| Item | What the certificate must show |
|---|---|
| Document control | Document type (2.1, 2.2, 3.1 or 3.2), document number, date of issue and page numbering. |
| Manufacturer | Name and address of the organisation that manufactured the product and takes responsibility for it — not a trading company, unless it is the manufacturer of record (Clause 2.3). |
| Order reference | Purchase order number; the purchaser’s name where the order requires it. |
| Product description | Product form (seamless pipe, welded tube, plate, forging), the product specification and its edition, and the grade or UNS designation. |
| Dimensions and quantity | Outside diameter and wall thickness (or NPS and schedule), length, number of pieces or total mass, and delivery condition. |
| Traceability | Heat number, and the heat-treatment batch or test unit where the product specification defines one. The number must match the marking on the product and the packing list. |
| Chemical results | Product analysis for the elements required by the product specification — not only a ladle analysis from the steelmaker. |
| Mechanical results | Tensile strength, yield or proof strength, elongation and hardness, plus impact or other tests where the order or product specification requires them. |
| Other tests | Results of the hydrostatic or nondestructive electric test, and of any eddy-current, ultrasonic, PMI, corrosion or grain-size examination specified in the order. |
| Compliance statement | The declaration that the products comply with the requirements of the order. This is part of the definition of every type, including 3.1. |
| Validation | Signature, name and position of the responsible person (Clause 5). A stamp without a legible name and function does not meet this requirement. |
Three failures recur. The first is a certificate whose heat number does not match the stencil on the pipe or the number on the packing list — the document is then worthless as traceability, however good the results. The second is a stamp with no legible name or position, which fails Clause 5. The third is a certificate that reports a heat no larger than the shipment could plausibly have come from, or identical values repeated across different heats. All three are easier to resolve before shipment than after arrival.
Test results transferred from incoming material
Clauses 4.1 and 4.2 both contain a paragraph that buyers rarely read and should. The manufacturer is permitted to transfer onto the certificate relevant test results obtained by specific inspection on primary or incoming products it uses, provided it operates traceability procedures and can provide the corresponding inspection documents.
In tube production this is routine: a mill making seamless tube from purchased hollows or strip may report the chemical analysis of the incoming material on the finished-tube certificate. That is lawful under the standard. What the buyer must confirm is that the results are traceable to the delivered heat and that the certificate shows the traceability, not merely a set of numbers. Where the order requires tests on the finished product — tensile properties after the final heat treatment, for example — those cannot be replaced by incoming-material results.
Intermediaries, stockists and copies
Clause 2.4 defines an intermediary as an organisation supplied with products by manufacturers which then supplies them onwards, either without further processing or after processing that does not change the properties specified in the purchase order and product specification. Clause 6 then sets the rule for the documents: an intermediary passes on either the original or a copy, without any alteration, accompanied by suitable means of identifying the product so that traceability between product and documentation is maintained.
Copying is permitted where traceability procedures are operated and the original is available on request — and on a copy it is permissible to replace the original delivered quantity with the actual partial quantity delivered. What is not permitted is altering the manufacturer’s name, address or results. An intermediary that changes the specified properties becomes a manufacturer and must issue its own document as well as pass on the original.
Practically, when you buy from stock, ask for the mill certificate and the stockist’s traceability reference, and check that the heat numbers on the certificate still correspond to the marking on the material after cutting.
EN 10204 3.1 versus 3.2
| Feature | 2.1 | 2.2 | 3.1 | 3.2 |
|---|---|---|---|---|
| Test results shown | No | Yes | Yes | Yes |
| Results relate to the delivered pieces or their test unit | No | Not necessarily | Yes | Yes |
| Issued by the manufacturer | Yes | Yes | Yes | Yes |
| Validated by a representative independent of the manufacturing department | No | No | Yes | Yes |
| External signature (purchaser or officially designated inspector) | No | No | No | Yes |
| Typical specification | Stock and commodity supply | General fabrication | Pressure piping, heat exchanger tube, project supply | Offshore, nuclear, buyer-witnessed or regulated scopes |
Specify 3.1 as the default for pressure piping, heat exchanger tube and general project supply. Specify 3.2 where a regulation, an end user, a classification society or a project specification requires an independent party to witness the tests — offshore, nuclear, and some oil and gas and pressure equipment scopes. A lower type cannot be substituted where a higher one is specified; the reverse substitution is normally acceptable, and the PED guidance notes that a document of a higher type is always acceptable.
Mapping the 1991 types onto the 2004 edition
The Foreword to EN 10204:2004 lists the changes, and one of them catches people out. The number of inspection documents was reduced, and the old letter suffixes do not map the way people assume.
| EN 10204:1991 | EN 10204:2004 |
|---|---|
| Type 2.1 | Type 2.1 — retained |
| Type 2.2 | Type 2.2 — retained |
| Type 2.3 | Deleted |
| Type 3.1.B | Type 3.1 |
| Type 3.1.A, type 3.1.C and inspection report 3.2 | Type 3.2 |
The practical consequence: a drawing or project specification that still calls for 3.1B is asking for what the current edition calls 3.1. A requirement written as 3.1A or 3.1C corresponds to 3.2, because those types carried an external signature. Reading “3.1B” as “a bit more than 3.1” and quoting 3.2 is a common and expensive mistake on refurbishment projects.
EN 10204 and ASTM mill certificates
ASTM and EN 10204 are different systems that overlap in practice. ASTM product specifications require the manufacturer to certify that the material conforms to the specification and to furnish test results; the general requirements for the product family define what that certification and report contain. EN 10204 adds the European document typing and the independent-inspection-representative validation on top.
| Specification family | Material | Certification practice |
|---|---|---|
| ASTM A312 / A213 / A269 / A789 / A790 | Stainless steel pipe and tube | The specification requires the manufacturer to certify that the material conforms, and to furnish a test report. The general requirements (for example ASTM A1016) define what that certification and report contain. |
| ASTM B161 / B163 / B167 / B444 / B622 | Nickel alloy pipe and tube | Same principle: certification by the manufacturer, plus the test results required by the product specification. |
| ASME SB-xxx | Code-stamped pressure equipment | The ASME Section II adoption of the ASTM specification, with additional marking and documentation requirements under the code. |
On an export order this usually means one document serving two purposes: a mill test certificate that satisfies the ASTM specification and is typed as EN 10204 3.1. That works, provided the certificate states the ASTM designation and edition and shows the results the ASTM specification requires — not only the results the mill normally reports. Where a European design code governs, the PED requirement below applies on top of the ASTM product requirements. Our TP316L seamless tube and the other product pages list the documents supplied as standard.
EN 10204 under the Pressure Equipment Directive
Annex ZA of EN 10204:2004 is informative and maps Clauses 3 and 4 to Annex I, section 4.3 of Directive 97/23/EC. It also settles a terminology question that causes arguments in review meetings: the Directive’s “certificate of specific product control” and the standard’s “inspection document based on specific inspection” are equivalent terms.
Directive 97/23/EC has since been replaced by 2014/68/EU. The structure of Annex I, section 4.3 carries over: the equipment manufacturer must ensure materials conform to the specification, and the material manufacturer must certify that the delivery complies with the specification and the order. Figure ZA.1 sets out which document satisfies that requirement.
| Scope under the PED | Inspection document normally required |
|---|---|
| Main pressure-bearing parts, categories II, III and IV | A certificate of specific product control — that is, a 3.1 or 3.2 document. Figure ZA.1 gives 3.1 where the material manufacturer operates a quality management system certified by a competent body established within the Community and assessed for materials; otherwise 3.2. |
| Main pressure-bearing parts, category I | Test report 2.2 is normally accepted under PED guidance. |
| Attachments and other pressure parts | Test report 2.2, unless the order specifies more. |
| Any category | A document of a higher type than the minimum is acceptable. Non-specific inspection may be replaced by specific inspection where the material standard or the order says so (Figure ZA.1, note a). |
Two practical points follow. First, where the mill does not hold an appropriately certified quality management system assessed for materials, a 3.1 certificate cannot simply be issued on request — the route becomes 3.2 with third-party involvement, and that has to be planned into the schedule. Second, the certificate type does not discharge the equipment manufacturer’s own obligations: material specification review, dimensional and marking checks, and the conformity assessment procedure all remain.
Five mistakes buyers make with EN 10204
- Treating 3.1 as third-party certification. It is a manufacturer document, validated internally but independently of production. If the project needs an external signature, the requirement is 3.2.
- Assuming EN 10204 mandates tests. A certificate without impact or corrosion results is not defective if those tests were never ordered. Specify the tests first, then the document type.
- Leaving the type unstated. “Mill certificate required” can be satisfied with a 2.1 declaration carrying no test data.
- Reading old designations by number rather than by mapping. 3.1B is now 3.1; 3.1A and 3.1C are now 3.2.
- Treating the certificate as a corrosion guarantee. It reports tested properties against a specification. Fitness for a process environment is a separate assessment, and for sour service that means NACE MR0175 / ISO 15156, not a certificate type.
How to write the requirement into an RFQ and purchase order
A precise clause costs one paragraph and prevents a shipment-level argument. The example covers the common case; adjust the test list to the product specification you are ordering.
“All pipe and tube shall be supplied with an EN 10204:2004 inspection certificate 3.1, in English, showing: manufacturer name and address; purchase order number; product specification and edition; grade and UNS designation; dimensions, wall thickness and quantity; heat number and heat-treatment batch; product analysis; tensile properties; and the results of the hydrostatic or nondestructive electric test. The certificate shall be validated with the name and position of the manufacturer’s authorised inspection representative independent of the manufacturing department, in accordance with Clause 5. Heat numbers on the certificate shall match the markings on the tubes, the bundles and the packing list. Where results are transferred from primary or incoming material under Clause 4.1, the traceability shall be identified on the certificate. A 3.2 certificate, prepared with the purchaser’s authorised inspection representative witnessing the tests, is required for [scope]. Third-party inspection by [agency] shall be completed before shipment.”
Three additions are worth considering on high-value orders: a requirement that the certificate be raised for the specific heat rather than for a stock item; a requirement that any corrected or re-issued certificate carry a revision number; and a requirement that the original document travel with the goods rather than being sent afterwards.
Frequently asked questions
Is an EN 10204 3.1 certificate a third-party certificate?
No. Clause 4.1 defines it as a document issued by the manufacturer, validated by the manufacturer’s authorised inspection representative who is independent of the manufacturing department. That representative is still part of the manufacturer’s organisation. Independence from the production department is a real control, but it is not independence from the supplier. Only 3.2 brings in a signature from outside the manufacturer.
What is the difference between 3.1 and 3.2?
Both report the results of specific inspection. Clause 4.2 requires the 3.2 certificate to be prepared by both the manufacturer’s authorised inspection representative and either the purchaser’s authorised inspection representative or the inspector designated by the official regulations. If your project requires witnessed testing, specify 3.2 — and arrange the witnessing before the tests are run, because a 3.1 cannot be upgraded after shipment.
Does EN 10204 itself require impact tests, corrosion tests or PMI?
No. Clause 4.1 states that the test unit and the tests to be carried out are defined by the product specification, the official regulation and corresponding rules, and/or the order. EN 10204 fixes the document type, the basis of inspection and the validation — not the test programme. A 3.1 certificate without impact results is not defective if no impact test was ordered.
What happened to the old 3.1A, 3.1B and 3.1C designations?
The Foreword to the 2004 edition maps them explicitly. Type 3.1 of the 2004 edition replaces type 3.1.B of the 1991 edition, while types 3.1.A, 3.1.C and the inspection report 3.2 of the 1991 edition are replaced by type 3.2. Type 2.3 was deleted. Drawings and specifications that still call for “3.1B” are referencing a withdrawn edition — it now means 3.1, not 3.2.
Can the certificate include test results from material the mill bought in?
Yes, within limits. Clause 4.1 and Clause 4.2 both permit the manufacturer to transfer onto the certificate relevant results obtained by specific inspection on primary or incoming products, provided the manufacturer operates traceability procedures and can provide the corresponding inspection documents. This is normal for tube made from purchased strip or hollows. What the buyer must confirm is that the transferred results are traceable to the delivered heat and that the certificate says so.
Can a stockist or distributor issue its own 3.1 certificate?
Clause 6 answers this. An intermediary passes on either the original or a copy of the manufacturer’s inspection document without any alteration, accompanied by suitable means of identifying the product so that traceability is maintained. Copies are permitted where traceability procedures are operated and the original is available on request, and the delivered partial quantity may replace the original quantity on a copy. An intermediary that processes the product without changing the specified properties is still an intermediary; one that changes them is a manufacturer and must issue its own document.
Does a 3.1 certificate prove the pipe will resist my process environment?
No. The certificate reports that tested properties meet the specification. It does not certify corrosion performance in a particular medium, and it does not replace a corrosion assessment, a material selection study, or a project qualification such as NACE MR0175 / ISO 15156 for sour service. Chemistry within specification is the starting point for that assessment, not the conclusion.
Can I get an EN 10204 certificate for material made to an ASTM specification?
In practice, yes, and it is common on export orders: the mill produces to the ASTM product specification and types the document as EN 10204 3.1 for the same heat. The certificate must still state the ASTM designation and edition and show the results the ASTM specification requires. Where the two systems differ, state both in the purchase order and say which governs acceptance.
Which type should I put in the purchase order?
For pressure piping, heat exchanger tube and general project supply, specify EN 10204:2004 inspection certificate 3.1. Move to 3.2 only where a regulation, an end user or a classification society requires independent witnessing. Never leave the type unstated: an unqualified order can be satisfied with a 2.1, which carries no test results.
Related standards and technical guides
The product specifications that define the tests behind an inspection document, and the standards that govern sour service and material selection:
ASTM A312
ASTM A213
ASTM A269
ASTM A270
ASTM A789
ASTM A790
ASTM A1016
ASTM A999
ASTM B163
ASTM B167
ASTM B444
ASTM B622
ASTM B829
ISO 15156-3:2020
NACE MR0175 / ISO 15156
Nickel Alloy Pipe and Tube Buyers’ Guide
Technical references
- EN 10204:2004 — Metallic products — Types of inspection documents. CEN, October 2004; supersedes EN 10204:1991. Clauses 1–6, Annex A (Table A.1), Annex ZA. Publisher record
- EN 10168:2004 — Steel products — Inspection documents — List of information and description (cited in Clause 1, Note 1).
- ISO 10474:2013 — Steel and steel products — Inspection documents. Covers the same ground with the same four document types.
- PED 2014/68/EU — Annex I, section 4.3 — materials. Replaced Directive 97/23/EC, to which the Annex ZA of EN 10204:2004 refers.
This page is an independent technical overview prepared for buyers. It does not reproduce the text of EN 10204 and is not a substitute for the published standard. The edition named in the contract, the product specification and the governing design code control acceptance.